Hi,
I'm in a situation where I will not have a grid connection to my property before the 12th december cut-off for the current FIT tariff (it's a conversion of an existing building where the sellers had the power disconnected before they sold it to me)
Can I install an off-grid system before the 12th Dec and have it registered for the current tariff, and then later change it to an grid connected system, say one or two months later, when I have a grid supply?
I don't want to install a battery system and would either use the electriciity direct, or simply not use it until I'm grid connected
Anybody have experience of an off-grid to on-grid conversion - from the preservation of the tariff viewpoint?
Any advice / experience greatly received
I'm in a situation where I will not have a grid connection to my property before the 12th december cut-off for the current FIT tariff (it's a conversion of an existing building where the sellers had the power disconnected before they sold it to me)
Can I install an off-grid system before the 12th Dec and have it registered for the current tariff, and then later change it to an grid connected system, say one or two months later, when I have a grid supply?
I don't want to install a battery system and would either use the electriciity direct, or simply not use it until I'm grid connected
Anybody have experience of an off-grid to on-grid conversion - from the preservation of the tariff viewpoint?
Any advice / experience greatly received