hi guys
Got asked to look at a job the other day. Sweet old lady in a mobile park.
She had an electrician come out to do a socket. After doing it he told her the consumer unit needed changing as it was dangerous. This obviously worried her.
He quoted ÂŁ600. Hadnt dine anything else other than change a socket front, no tests etc.
So anyway She asked around. I went round and had a look. 4 circuits re wirable fuses and a 30Ma rcd protecting it all. Bonds in place etc etc.
I'm doing a full test as a given anyway but I've informed her that if after a full test everything is all a okay I wouldn't feel any need to change it. If however lots of work needed doing following the test I would but the test would be part of the work so qouldnt charge for the test and then the board.
Well the electrician who told her has now approached me and said I was wrong and shouldn't have poached his work.
Whats your opinion straight up change the board or if nothing is wrong just leave it??
Got asked to look at a job the other day. Sweet old lady in a mobile park.
She had an electrician come out to do a socket. After doing it he told her the consumer unit needed changing as it was dangerous. This obviously worried her.
He quoted ÂŁ600. Hadnt dine anything else other than change a socket front, no tests etc.
So anyway She asked around. I went round and had a look. 4 circuits re wirable fuses and a 30Ma rcd protecting it all. Bonds in place etc etc.
I'm doing a full test as a given anyway but I've informed her that if after a full test everything is all a okay I wouldn't feel any need to change it. If however lots of work needed doing following the test I would but the test would be part of the work so qouldnt charge for the test and then the board.
Well the electrician who told her has now approached me and said I was wrong and shouldn't have poached his work.
Whats your opinion straight up change the board or if nothing is wrong just leave it??