Ok, need to bounce ideas about if poss....
Existing building with 3ph TT supply (100mA RCD, non -S type), feeds another building 300m away with a 3ph sub DB (no RCD) where my customer is looking to fit a 50kWp PV feed to.
We're waiting on Ze values on the incomer. I have no other info at the moment.
Thoughts/concerns with feeding the PV into the sub DB?
Existing building with 3ph TT supply (100mA RCD, non -S type), feeds another building 300m away with a 3ph sub DB (no RCD) where my customer is looking to fit a 50kWp PV feed to.
We're waiting on Ze values on the incomer. I have no other info at the moment.
Thoughts/concerns with feeding the PV into the sub DB?