R
Robo
Sorry to bring this up again, i just got very confused with the mass input i had on my last post.
So
You can export the tnc-s earth to an outbuilding. Any gas water or metal work needs to be earthed back to the outbuilding db. However its best to get permission from building control.
I could rod the installation but if i did i would have to keep the tncs earth seperate ( use insualted board. And again all metal worked bonded to outbuilding db so protected from rod.
I think this is correct. Please clarify.
If i came across and tns system is it fine to export that earth.
Thanks
So
You can export the tnc-s earth to an outbuilding. Any gas water or metal work needs to be earthed back to the outbuilding db. However its best to get permission from building control.
I could rod the installation but if i did i would have to keep the tncs earth seperate ( use insualted board. And again all metal worked bonded to outbuilding db so protected from rod.
I think this is correct. Please clarify.
If i came across and tns system is it fine to export that earth.
Thanks