Just undergoing MCS accreditation Training etc.
First job looks nice and straight forward as far as Array Layout and Building Structure etc.
However the stable block to be used has a remote distribution board from the Main incommer, house Distribution board and main supply Meter.
However one question is it OK to put the new Solar array electrical connection and solar meter with this remote Distribution board.
Thanks
First job looks nice and straight forward as far as Array Layout and Building Structure etc.
However the stable block to be used has a remote distribution board from the Main incommer, house Distribution board and main supply Meter.
However one question is it OK to put the new Solar array electrical connection and solar meter with this remote Distribution board.
Thanks