F
Frosty69
Hi people,
If I spur of the ring main to a switched fused spur to supply an outside 500watt floodlight, when doing IR test do I just IR the cable I have put in (from socket to light)? Or the full ring?
Thankyou
If I spur of the ring main to a switched fused spur to supply an outside 500watt floodlight, when doing IR test do I just IR the cable I have put in (from socket to light)? Or the full ring?
Thankyou