U
ukpablo
Ok, bear with me on this one!
got to customers house to do some work in bathroon, subcontracting to a local bathroom fitter for a 'homebase' contract.
bit of a drive out into the sticks, rcbo required to fit new whirlpool bath feed which i would be installing from board, and to also terminate a body dryer from old 10mm shower feed which was disconnected!
All this was info from bathroom contractor as i had not done a site survey myself.
Also this would be dependant on what i find at CU, however it had apparently been tested recently etc etc.
I turned up, removed cover from board but when i looked i informed them that there was not a spare way on board! (problem no 1)
All the kitchen was done about 3 months ago by a local contractor(the property is housing association by the way) and the main incomer has been changed from TT system to a PME TNCS upgrade
solution for (problem No 1) would be to fit bigger henley block and run whirlpool from a small new board, with new tails etc.
Looking at the CU in greater depth, and applying diversity to existing ccts (including the 9KW shower due to be replaced by a 9.5 KW body dryer) i calculated a total of 128 A.................................this does not take into account a seperate board running 5 storage heaters each on 16A breakers run from the same 16mm tails.
So here is my dilemma, Ze was good, Bonding in place, but the main switch on CU is only 80A and the main cutout fuse is only 60A!!!!!
Plus it all runs through a pay as u go meter which is sealed..................so looks a bit difficult to add a bigger henley block!
I have run all cables as contracted to do so and not terminated.
Crunch time..................was i right to inform customer that existing main fuse is not big enough? they need to contact DNO to clarify and get in writing?
Inform customer that this should have been picked up from previous electrician when kitchen was done..................and also that there are no copies of test results etc on any work done either?......so contact them too and ask why this is?
Any thoughts appreciated.................sorry if it is long winded...........just like my day yesterday really!!!
got to customers house to do some work in bathroon, subcontracting to a local bathroom fitter for a 'homebase' contract.
bit of a drive out into the sticks, rcbo required to fit new whirlpool bath feed which i would be installing from board, and to also terminate a body dryer from old 10mm shower feed which was disconnected!
All this was info from bathroom contractor as i had not done a site survey myself.
Also this would be dependant on what i find at CU, however it had apparently been tested recently etc etc.
I turned up, removed cover from board but when i looked i informed them that there was not a spare way on board! (problem no 1)
All the kitchen was done about 3 months ago by a local contractor(the property is housing association by the way) and the main incomer has been changed from TT system to a PME TNCS upgrade
solution for (problem No 1) would be to fit bigger henley block and run whirlpool from a small new board, with new tails etc.
Looking at the CU in greater depth, and applying diversity to existing ccts (including the 9KW shower due to be replaced by a 9.5 KW body dryer) i calculated a total of 128 A.................................this does not take into account a seperate board running 5 storage heaters each on 16A breakers run from the same 16mm tails.
So here is my dilemma, Ze was good, Bonding in place, but the main switch on CU is only 80A and the main cutout fuse is only 60A!!!!!
Plus it all runs through a pay as u go meter which is sealed..................so looks a bit difficult to add a bigger henley block!
I have run all cables as contracted to do so and not terminated.
Crunch time..................was i right to inform customer that existing main fuse is not big enough? they need to contact DNO to clarify and get in writing?
Inform customer that this should have been picked up from previous electrician when kitchen was done..................and also that there are no copies of test results etc on any work done either?......so contact them too and ask why this is?
Any thoughts appreciated.................sorry if it is long winded...........just like my day yesterday really!!!