Hi
Have done PIR of church today.
There are quite a few lights at high level, more than 30 feet off the ground. There are pews in the way and I cant get up to them even with a tower although someone has installed them off a ladder or with full scaffolding at some stage. There are also some metal chandeliers about 15 feet up I did R2 readings which were OK.
I cant really do Zs reading on these or heaters which are 20 feet up. The risk of shock is effectively zero as they are all wired in MICC and nobody is going to be able to touch them when they are energised.
Do I have to do Zs readings.
Thanks
Have done PIR of church today.
There are quite a few lights at high level, more than 30 feet off the ground. There are pews in the way and I cant get up to them even with a tower although someone has installed them off a ladder or with full scaffolding at some stage. There are also some metal chandeliers about 15 feet up I did R2 readings which were OK.
I cant really do Zs reading on these or heaters which are 20 feet up. The risk of shock is effectively zero as they are all wired in MICC and nobody is going to be able to touch them when they are energised.
Do I have to do Zs readings.
Thanks