L
LlandrilloSpark
Guys, if youve got time I wouldnt mind a brief opinion of this finding from this morning before I write it up.
Lighting circuit no cpc from about halfway, all metal fittings earthed before the break then no continuity into bedroom and bathroom/ all roses and class two fitted from that point but steel back boxes are used, no earth to bathroom fan, but bathroom lights are SELV
cheers
Lighting circuit no cpc from about halfway, all metal fittings earthed before the break then no continuity into bedroom and bathroom/ all roses and class two fitted from that point but steel back boxes are used, no earth to bathroom fan, but bathroom lights are SELV
cheers