Bornagainsparky
I know that nobody likes talking about costings and of course prices vary region to region however I have been asked by my local council if I would like to be included on their lists to carry out PIR's where the average cost is ÂŁ80 now I know that I couldn't operate at such a cost (I could but it would be suicide and I would certainly have to cut corners) As you all know, to carry out a full and proper PIR can be time consuming but on speaking to some Electricians they test the minimal, Visual, RCD,Zs and PFC at Board possibly at a Socket and that is it, less than 1 hours work, I could do that for ÂŁ80 but I charge ÂŁ28.50 per hour and it takes what it takes because I go through the full test procedure.
OK so they are prepared to put their name in the frame for ÂŁ80 and probably carry out 2-3 or even 4 inspections a day on this basis and therefore not a bad earner but I would be worried about any comebacks if I were to do this. If I spend a full day including travelling I would earn ÂŁ228, not every day I hasten to add and rarely do I but potentially I could.
After this long winded intro I wonder am I charging too much, are the aforementioned charging and doing too little, or is it a horses for courses situation, any feedback welcomed
OK so they are prepared to put their name in the frame for ÂŁ80 and probably carry out 2-3 or even 4 inspections a day on this basis and therefore not a bad earner but I would be worried about any comebacks if I were to do this. If I spend a full day including travelling I would earn ÂŁ228, not every day I hasten to add and rarely do I but potentially I could.
After this long winded intro I wonder am I charging too much, are the aforementioned charging and doing too little, or is it a horses for courses situation, any feedback welcomed