B
brian
Hi,
I am concerned in the event of neutral faliure the CPC will take the installation load so should i TT the external garden lights from the PME of the house, or connect them into the CPC of the providing supply?
I am concerned in the event of neutral faliure the CPC will take the installation load so should i TT the external garden lights from the PME of the house, or connect them into the CPC of the providing supply?