Hi guys,
I've just completed a job in moving 14 plastic / rubber injection moulding machines from their old factory up to their new unit, most have been supplied with 100A / 125A fuses from the busbar down to a local ISO and into the machine just to give an idea of the size of the install. Half of them could've been supplied by 63A / 80A to be fair but I had lots of 35mm 4 core laying around to use
My question is this.....
There was an old PFC unit that they want re-installing into the new building, but how do I figure out that it's actually suitable / efficient if I do install it?
Half the machines don't have details and 5 of them are stepped down to 110V with their own local transformers.
Cheers for any help in advance peeps
I've just completed a job in moving 14 plastic / rubber injection moulding machines from their old factory up to their new unit, most have been supplied with 100A / 125A fuses from the busbar down to a local ISO and into the machine just to give an idea of the size of the install. Half of them could've been supplied by 63A / 80A to be fair but I had lots of 35mm 4 core laying around to use
My question is this.....
There was an old PFC unit that they want re-installing into the new building, but how do I figure out that it's actually suitable / efficient if I do install it?
Half the machines don't have details and 5 of them are stepped down to 110V with their own local transformers.
Cheers for any help in advance peeps