Looking for abit of advice?
We are quoting to replace some SWA cabling feeding various sub boards.
I have an ABB power factor correction module in place, this is feeding a control panel in the plant room, feeding motors and ventilation equipment
We need to replace the 2 x 150mm 4 core SWA feeds from the PFC to the control panel, as we are not altering the design of the installation, is there any testing to be done on the PFC unit either before or after powering up?
ABB unit with digital display with rotary isolator
Any positive advice would be great
Looking for abit of advice?
We are quoting to replace some SWA cabling feeding various sub boards.
I have an ABB power factor correction module in place, this is feeding a control panel in the plant room, feeding motors and ventilation equipment
We need to replace the 2 x 150mm 4 core SWA feeds from the PFC to the control panel, as we are not altering the design of the installation, is there any testing to be done on the PFC unit either before or after powering up?
ABB unit with digital display with rotary isolator
Any positive advice would be great