Say you wanted to power a shed office, or somethign similar, and lets say it's up the end a garden.
Would you split at the meter to an isolator switch or a breaker then swa all the way up to a new CU.
Then for earth would you have to use an earth spike instead of the earth down the armoured?
Just a random senario I have yet to do and just thought about lol