N
novolts
Hi Guys
I am due to sit my practical exam next week and I could do with some sound advice as I am scared stiff .If it is a prriodic inspection I am doing and I do the live testing first before carrying out the Ze is it ok just to switch of the isolator of the DB and then disconnect the main earth and take the reading from the live side of the DB isolator, isolator off obviously or do I need to switch of the main switch to he DB
thanks
novolts
I am due to sit my practical exam next week and I could do with some sound advice as I am scared stiff .If it is a prriodic inspection I am doing and I do the live testing first before carrying out the Ze is it ok just to switch of the isolator of the DB and then disconnect the main earth and take the reading from the live side of the DB isolator, isolator off obviously or do I need to switch of the main switch to he DB
thanks
novolts