hi all,
im looking for some pointers for my assesment. any advice would be grateful. i understand that i need to show two jobs, so i was thinking ive just changed my own c.u so assume that would count as one.
the other one i was thinking of is a kitchen rewire, utility rewire and a shower install.
with regards to the second job would it be ok to use even though the customer doesnt want the c.u changed. ( the original c.u is a12 way split load).
thanx in advance.
im looking for some pointers for my assesment. any advice would be grateful. i understand that i need to show two jobs, so i was thinking ive just changed my own c.u so assume that would count as one.
the other one i was thinking of is a kitchen rewire, utility rewire and a shower install.
with regards to the second job would it be ok to use even though the customer doesnt want the c.u changed. ( the original c.u is a12 way split load).