beanzntoast

Its me:)
Hi all,i know its a difficult question without seeing the job but its a roundabout figure i'm after.It's a new shower circuit that needs installing starting from scratch its about a 35 metre run from the consumer unit,piping up the shower with water( about 2 metre run),installing a shower screen,splitting the tails to a shower cu,installing the main bonding to gas & water(none present))consumer unit in the middle,25 metre run 1 way to the water,25 metre run the other direction to the gas,installing equip bonding in bathroom (none present)if resistance tests unsatisfactory.I was thinking of charging ÂŁ300 just for labour (maybe 2 days job).Does this sound expensive or reasonable to your kind gentlemen;),No offence taken if anybody thinks its expensive:confused:,i don't want to rip the client off but at the same time i want to charge fairly,Thanks for any replies
 
Last edited by a moderator:
i once put up a target figure of ÂŁ200 per day in london and got posts saying that was cheap i think yours must be more than fair in that case.

"installing equip bonding in bathroom (none present)if resistance tests unsatisfactory"

check out 17th ed as this is no longer required but rcd for any circuit in bathroom is
 
Last edited by a moderator:
i once put up a target figure of ÂŁ200 per day in london and got posts saying that was cheap i think yours must be more than fair in that case.

"installing equip bonding in bathroom (none present)if resistance tests unsatisfactory"

check out 17th ed as this is no longer required but rcd for any circuit in bathroom is
Hi thanks for both your replies I have actually read this& questioned it,could anybody actually claryfy if this is the case that supplementary bonding can be ommited in the bathroom if all circuits in the special location are RCD protected.I have read it in the BRB but just want to make sure i have interpretted it correct thanks again
jason
 
Last edited by a moderator:
Hi thanks for both your replies I have actually read this& questioned it,could anybody actually claryfy if this is the case that supplementary bonding can be ommited in the bathroom if all circuits in the special location are RCD protected.I have read it in the BRB but just want to make sure i have interpretted it correct thanks again
jason

yes providing all requirements are met in reg 701.415.2 and 415.2.2 (so no you cant just rely on the rcd)
 

Reply to pricing in the Australia area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
303
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
819
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
897

Similar threads

  • Article
This is an RSS feed of thread: Why is my pumped shower suddenly slow in starting? Content of the thread: Not been on here for ages, got a lot of...
Replies
0
Views
208
Yes, that was actually something making me uncomfortable too, the bonding of it all. I need to have another look at it, I'm not sure if the...
Replies
2
Views
825

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top