Interesting, and I am very surprised it has not been raised before now. I don't see how they could successfully prove this has happened unless an installation site was visited shortly after the 12th however?
 
I suppose if you used the real installation date on the part P self-certification forms or other paperwork, they might pick that up.

From the article it sounded like they were investigating abnormal peaks in registrations - e.g. an installer who had been registering 3-4 systems per week during November and early December suddenly registering 25 on the 9 December.
 
still tricky to prove. I was project managing some installations for a firm that were completed over a 2 week period but for reasons best known to themselves they registered the whole lot on the sunday evening of the 12th
 
I bet we never see a single prosecution. Someone in norfolk told me on the phone yesterday he has yet to finish two 20kw systems registered before the 12th because he can't get the modules. He said he'd done 10kw installs for a company from lincolnshire that were registered before the 12th and installed later. **ss take or what.
 
I also find it difficult to believe that there could be evidence, purely from a database analysis, that would stand up to the 'beyond all reasonable doubt' test in a criminal case of fraud unless there had been some independent site visit before or shortly after 12/12. And not all 'evidence' is necessarily admissible in court.

(Spitfire, it has been raised here before as I remember advising someone not to think about doing it.)
 
Last edited by a moderator:
I also find it difficult to believe that there could be evidence, purely from a database analysis, that would stand up to the 'beyond all reasonable doubt' test in a criminal case of fraud

Sorry, I didn't mean that they'd use the database analysis to proof fraud, just that they may use an unexpected peak just before the 12 Dec as an indicator to then either do an on site check or check other paperwork (such as the Part P) for data inconsistencies.
 
I bet we never see a single prosecution. Someone in norfolk told me on the phone yesterday he has yet to finish two 20kw systems registered before the 12th because he can't get the modules.

I thought the MCS registration included serial numbers for the modules installed?
 
name, address, type of panels and mcs approval no, dnc, estimated annual generation, gen meter serial no and reading.
No module ser nos required.
 
I suppose MCS assessors may take a greater interest in dates of panel deliveries around last December when they come to do their next inspection, but they can do that as a matter of course for everyone without needing to weed any out. Although analysis of the database might make them target certain installers earlier.
 
MCS assessors will have no incentive to cause a problem. They are effectively being paid by the person they are assessing and if anything will want to keep registered numbers with their organisation healthy.
 
What you have all overlooked, and unboubtfully the offenders, is it will be the incoming electric meter that will tell a story as the readings will obviously change once a system has been installed.
No getting over that one.?:95:
 
circumstantial evidence, it proves nothing. Generation rates are so poor during december the difference will be very small and barely noticeable. The inverter log might though!
happilly all mine were completed well before the cut off but I do know of other firms who were still installing at the end of december. I would think invoices will be the biggest tell tale if companies had to wait to get kit. If it was just lack of installation time then it might be harder to prove.
 
What you have all overlooked, and unboubtfully the offenders, is it will be the incoming electric meter that will tell a story as the readings will obviously change once a system has been installed.
No getting over that one.?:95:

Certainly no way to pin down a criminal offence based on a specific date now a couple of months in the past. Also remember that a system only had to be commissioned for an MCS cert to be issued. It might then have been switched off for a multitude of reasons and re-commissioned at any later date.
 

Reply to Prosecution for Installations Completed after 12/12 but Registered Before in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
259
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
744
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
738

Similar threads

I am living in the north of Thailand outside of the big city. That means in the rainy season we have multiple times per week power outages...
Replies
0
Views
452
Thanks all for your comments, advice and suggestions. The following is probably pretty boring for most, and is simply a summary of how the job...
Replies
8
Views
843

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top