Berns
Hi
I am gettingmyself prepared for G59 connection applications for PV systems. Guidance onwhat is needed with regards to technical date and drawings would be muchappreciated.
Withreference for the application form for 'e-on'
http://www.eon-uk.com/downloads/G59_APP_FORM_AW.pdf
Thisapplication applies to all generating source including spinning ones. Withregards to PV systems do anyone know what is required for parts 1A and B,especially the following:
Power station standbyimport requirements (see note A2)
Maximum active power import
____________________________MW
Maximum reactive power import (lagging)
___________________________MVAr
Maximum reactive power export (leading)
___________________________MVAr
Power station top-upimport requirements (see note A3)
Maximum active power import
____________________________MW
Maximum reactive power import (lagging)
___________________________MVAr
Maximum reactive power export (leading)
___________________________MVAr
Power station exportrequirements (see note A4): Total power station output at registered apacity (net of auxiliary loads)
Registered capacity (maximum active power export)
______________________MW
Maximum reactive power export (lagging)
______________________MVAr
Maximum reactive power import (leading)
______________________MVAr
Power station maximumfault current contribution (see note A5)
Peak asymmetrical short circuit current at 10ms (ip) for a 3short circuit fault at the connection point
___________________kA
RMS value of the initial symmetrical short circuit current (Ik”) for a 3short circuit fault at the connection point
___________________kA
RMS value of the symmetrical short circuit current at 100ms (Ik(100)) fora 3 short circuit fault at theconnection point
___________________kA
Kind Regards
BernardElliott
[email protected]