S
switched on
Hi i have a 50 m run from the dno intake in the garage to the house. I have decided to run a 3 core armoured and install a switch fuse at the garage end. The only trouble is though a 35mm armoured is a bitch to terminate in a single phase board. Anyone come across this problem just wandering as i did a 25mm earth in a single phase board and that only just fit. Thanks in advance