R
Ridgey88
I have re-wired a garage and using for my niceic assessment. i have drilled the joists all in correct positions and depth according to buildings regs, and clipped then dropped into conduit down to accessories etc. problem is the roof or floor is on an angle so at one end of the garage the ceiling hieght is say above two meters out of reach, but at the other end of the garage you can reach the joists they are not far off head hieght. obviously i have run the cables through the joist which means at the end where the ceiling is low you can reach the cables passing through the joists! is this acceptable? or do i need to rectify this some how? it has to be right as its one of my jobs to be accessed.
Thanks all
Kirk
Thanks all
Kirk