L
leekemp85
I have only been self employed for a few weeks, and could do with help quoting a job
Its a large conservatory they want 5 double sockets and 3 wall lights i will be splitting the ring from the living room for the sockets (there will be no load on the circuit just TV, radio and lamps)
two days work in total, the circuit is on the rcd.
Do you normally charge day rate or per hour. I don't want to shoot my self in the foot by not charging enough but could do with the work as I will get more work from the builder in the future.
(sorry about the very poor pic but it may help )
Its a large conservatory they want 5 double sockets and 3 wall lights i will be splitting the ring from the living room for the sockets (there will be no load on the circuit just TV, radio and lamps)
two days work in total, the circuit is on the rcd.
Do you normally charge day rate or per hour. I don't want to shoot my self in the foot by not charging enough but could do with the work as I will get more work from the builder in the future.
(sorry about the very poor pic but it may help )