R
Ross Trician
when testing a lighting circuitthat consists of Switched live, neutral, cpc and permenant live (for emergency lights in the row) which would you note as your R1+R2 test.
I tested both the lives and neutral and cpc for continuity and then I did an r1+r2 test on both sw live and permenant live and recorded both on the sheet. as this is what the onsite tricians wanted but wondered which is the correct R1+R2???
thanks, Ross
I tested both the lives and neutral and cpc for continuity and then I did an r1+r2 test on both sw live and permenant live and recorded both on the sheet. as this is what the onsite tricians wanted but wondered which is the correct R1+R2???
thanks, Ross