E
Electricalserv
Does anybody put these in... What would the bods say?
what page is that on, mate
I think you must be reffering to High Integrity Earthing, as used where there are expected to be high earth leakage, I believe 10mA or above.
Only where the earth leakage is expected to be 10mA or above.
If there are two similar Radials, the CPCs can be linked to form a ring.
where there are several pieces of IT equipment plugged in to the circuit e.g. 6 computers.
still gas lighting up here.and some lighting circuits![]()
power supplies in pc's. ballasts and control gear in lighting. all have leakage currents due to design.
power supplies in pc's. ballasts and control gear in lighting. all have leakage currents due to design.