T
Test Probes
Hi. Situation: A new reitirement home has assitted baths installed in twin & earth with 50mm depth and with ceiling mounted pull switch. The supply is under the bath enclosure and is hard wired. Keeping in mind the controls will be handle by a skilled person (nures etc.) The circuit chart shows an MCB 32A and both my self and the foreman think it should be and RCD. Does it require an RCD?