RCD trips to fast on test | on ElectriciansForums

Discuss RCD trips to fast on test in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

B

bgec

Hay

I cant do an RCD test

When i press the test button the rcd trips before i can get a reading ??
 
I have tested with it on other jobs since with no issues. I will change the batteries just in case thanks cbw. 5x and 1x
 
my dilog gives a blank screen and just beeps at me then say M Ohm!! when batteries are low as its **** and i change them every bloody 3 weeks!!
 
Last edited by a moderator:
Is it on "soft" test thats if it has that option?
is it a loop test? because an earth loop impedeance test will cause RCD to trip
 
Last edited by a moderator:
could well be a "cooked" rcd - ramp test it and also check your tester on another rcd. A megger 1552 will show "TRP" if the rcd is faulty and not behaving. Have seen this when the load from the mcbs well exceeds the max cabability of the rcd.
 
my dilog gives a blank screen and just beeps at me then say M Ohm!! when batteries are low as its **** and i change them every bloody 3 weeks!!

What make testers have you got? My megger mft seems to get through them fairly quick, although have started turning them off between tests lately and this seems to help.
 
Hay

I cant do an RCD test

When i press the test button the rcd trips before i can get a reading ??

Ah! You are not doing what I think you are doing are you?!

The "TEST" button on the RCD is for manual mechanical testing only - you do not press this when carrying out the X1 and X5 tests with your meter.
 

Reply to RCD trips to fast on test in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
291
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
800
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
828

Similar threads

L
  • Question
My Understanding is the 6 Months interval is IET Guidance and this wording is incorporated onto the label which is a requirement in 514.12.2 where...
Replies
9
Views
654
If it’s rcbo’s, then it’s 30mA per circuit… an rcd mainswitch is 30mA for ALL circuits It may just be a cumulative earth leakage which was just...
Replies
9
Views
587

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top