Hi,
Working at a house (TT system) and a new build office/garage is to be built.
House has split load RCD board.
1. Should i use 1 of the spare ways and feed the office with a sub-main. or
2. Use henley blocks and take the supply from meter tails.
Option 1, will mean if the house trips then the office supply will turn off.
Option 2, the mains cable to the office will not be RCD protected and it is a TT system.
Thanks dan
Working at a house (TT system) and a new build office/garage is to be built.
House has split load RCD board.
1. Should i use 1 of the spare ways and feed the office with a sub-main. or
2. Use henley blocks and take the supply from meter tails.
Option 1, will mean if the house trips then the office supply will turn off.
Option 2, the mains cable to the office will not be RCD protected and it is a TT system.
Thanks dan