Hi all
So this is my problem or question, i have completed my C&G 2330 part 2 and 3 and i have a 17th edition qualification. I am about to start on my NVQ but i can't find a firm to work for locally, so can i subcontract and do work myself, then get a firm in to do the test and inspect? If so what sort of work can i undertake as i have taken on a full house rewire on a refurb build (they have basically gutted it so new electrics thoughout.)

Is this ok? Or who should i speak to to find out

THANKS

Just spoke to a electrician friend who lives miles away but he said i would be classified as a competent person so i could do the rewire but need to find someone who would be willing to come in and have a look at my work during the rewire to test and sign off after completion.

is this correct?
 
Last edited by a moderator:
Helllo dexstar,

for you NVQ you will need to be working for someone, its not impossible to do it yourself but you need to get varied work from commercial, industrial & domestic to complete the NVQ, this means satisfying your tutors who will come out and inspect your work. You need at least 30hrs per week work to build your portfolio within the given time period & you really need to learn techniques from an experienced electrician.

If your not part P (not with Elexca or NIC etc...) registered competent person scheme then you need to contact building control to check your work, this means calling them before you start work & paying them money to check your work. No other electrician can sign off your EIC for work you've done.

Useful info below:

From 1st January 2005 most electrical work in houses, some of which is quite routine such as changing a socket in a kitchen, must, by law, be notified to the local authority building control department; this includes DIY as well as tradesmen who undertake electrical work as a part of their normal activities (such as kitchen and bathroom fitters). The only exception is where the work is undertaken by a competent person who is a member of a government authorised scheme. The notification to the local authority is then handled by the organisation running the scheme.


The BS7671 definitions of minor (e.g. the additions or modifications to circuits) and major works (e.g. installation of a new circuit) have not been mirrored in the new legislation and there are minor works such as the fitting of a new socket in a kitchen that require notification.


ELECSA - Frequently Asked Questions


Hope this helps, I no works hard to come by but you don't wana rewire a house and find out u screwed up big time, cos it can cost lives.
 
thanks for the advice, i have contacted exeter building control and have the paper work on its way, i explained that i had already started some of the work for first fix and was assured this would be ok as long as i took a record including photos and cable calcs of the work done. They say they will get there local electrical contractor they use to come round and check intially what i have done, then sign it off when work is completed.

So from that i gather i can carry on.

Is that correct? And does it mean anyone can basically wire a house as long as someone checks during and after install?
 
yes you can carry on.

No disrespect intended but few people without having experience & trainning would be able to wire a property correctly. What will happen is that mistakes that are made may well be expensive to fix and it will come outa your pocket.

You have had resonable schooling doing the 2330 2&3 & 2383 but i'd say its a big ask to go straight into a hse rewire bud.

There's things that you might not remember like how far along a beams length you can make holes & how deep, the grouping & thermal factors, bonding etc... Once someone puts up the plasterboard and skims it your screwed!

If the guys coming at 1st fix then at least he can point out what he finds, gives you a chance to get it sorted.
 
Last edited:

Reply to really need some advice! in the Australia area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
310
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
834
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
933

Similar threads

  • Question
Hi, I’m after some advice. Back in 2005/6 I did the city and guilds 2351 course but never completed the last log book to gain the NVQ level 3...
Replies
0
Views
473
  • Question
Hello Dave, Thanks for taking the time to reply. I appreciate the info, I haven't updated this post yet, but I have since been talking to some...
Replies
3
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top