I am planning a job in Bath for an EV Charger on a Grade 1 listed building.
Have a long cable run at height, planning dept have raised issues with cable cleats! feel they are a bit chunky and would prefer something with a less chunky profile!! given they are nearly 2 and half stories up from ground nobody is going to notice! but the planning guy is a pedantic so and so.
Have also stipulated that cable and fixings must be painted on completion to blend in with Bath stone.
Owing to the length of cable run I will be using H07RNF - lighter and easier to work with up the scaffolding than SWA. Customer doesn't mind cost.
Only low profile option I can think of is metal cable ties and bases. base screwed to wall then tie cable. paint on completion.
If I used metal buckle clips then they are a bit fiddly to work with on larger cables.
Any other suggestions?
Have a long cable run at height, planning dept have raised issues with cable cleats! feel they are a bit chunky and would prefer something with a less chunky profile!! given they are nearly 2 and half stories up from ground nobody is going to notice! but the planning guy is a pedantic so and so.
Have also stipulated that cable and fixings must be painted on completion to blend in with Bath stone.
Owing to the length of cable run I will be using H07RNF - lighter and easier to work with up the scaffolding than SWA. Customer doesn't mind cost.
Only low profile option I can think of is metal cable ties and bases. base screwed to wall then tie cable. paint on completion.
If I used metal buckle clips then they are a bit fiddly to work with on larger cables.
Any other suggestions?