This may make you laugh. As an apprentice I was appointed as “assistant” site engineer on a new plant. Came the great day of switching on power to the MCC, Oh dear what a f**k up. The contracting foreman was adamant all drives will run the correct way.
A motor connected RYB to ABC will turn CW when looking at the shaft.
I was going purple around the gills when I explained to him the works had it’s own power station and it ran opposite to the grid! Every (over 100) motor had to be changed at the terminal box.
A motor connected RYB to ABC will turn CW when looking at the shaft.
I was going purple around the gills when I explained to him the works had it’s own power station and it ran opposite to the grid! Every (over 100) motor had to be changed at the terminal box.