went to quote on a job where they had the old r70 spotlightswhick keep blowing bulbs.
they want to install normal downlights and add a few.
the fuseboard is old wylex with mcbs. All bonding in place but do i need install a rcd for the work. I see it as only replacing what they have. If so i would install a rcd fused spur protecting the circuit.
what do you guys think.
went to quote on a job where they had the old r70 spotlightswhick keep blowing bulbs.
they want to install normal downlights and add a few.
the fuseboard is old wylex with mcbs. All bonding in place but do i need install a rcd for the work. I see it as only replacing what they have. If so i would install a rcd fused spur protecting the circuit.
what do you guys think.