Hi, I am due to replace an 7.5 kw electric shower with a new 7.5 kw one. I will be checking the external ze, r1+r2, zs, testing the RCD.
Will also upgrade the main bonding from 6 mm. For a straight swap do I need to issue an electrical certificate and any other test that I will have to carry out.
What are the option if there is no bonding in the bathroom and you do not want to damage the tiles?
MCB 40 amp type B
Will also upgrade the main bonding from 6 mm. For a straight swap do I need to issue an electrical certificate and any other test that I will have to carry out.
What are the option if there is no bonding in the bathroom and you do not want to damage the tiles?