Hi all,
Is there an actual regulatory requirement to install consumer metering (e.g. within the main incoming panel board) of the installation either as a whole, or phase by phase, in a new industrial or commercial 3 phase installation? If so what qualifies the such an installation as requiring this?
Thanks in advance.
Is there an actual regulatory requirement to install consumer metering (e.g. within the main incoming panel board) of the installation either as a whole, or phase by phase, in a new industrial or commercial 3 phase installation? If so what qualifies the such an installation as requiring this?
Thanks in advance.