Looking for some advice and timescale here. I'm not an electrician just a tennet with a housing association. I've been offered top floor flat in a tenement building( build 1930's) but I can't get moved in until Scottish Power have carried out works described as "Rewiring the entire block".
Does this mean full Street? Or simply the tenement ?. This sounds like major work to me which is likely to take months to complete?

The flat I've been offered is the only one that has failed EICR tests, this is after an isolator was installed.
 
If they are talking about the block of flats then probably it is the distribution system that feeds them, usually that would be you DNO (SSEN in Scotland), not the gas supplier. Some buildings have a BNO (company that deals with communal electrics) but many have the DNO taking charge on internal power distribution as no BNO has ever been appointed.

That would be work outside of your flat. Can you post your EICR with any identification redacted for us to comment on?
 
If they are talking about the block of flats then probably it is the distribution system that feeds them, usually that would be you DNO (SSEN in Scotland), not the gas supplier. Some buildings have a BNO (company that deals with communal electrics) but many have the DNO taking charge on internal power distribution as no BNO has ever been appointed.

That would be work outside of your flat. Can you post your EICR with any identification redacted for us to comment on?
Thanks for your reply Pc1966. If it were work outside of flat would this be weeks or months worth of work?. Unfortunately I have no access to the EICR or access to flat as things currently stand.
 
If they are talking about the block of flats then probably it is the distribution system that feeds them, usually that would be you DNO (SSEN in Scotland), not the gas supplier. Some buildings have a BNO (company that deals with communal electrics) but many have the DNO taking charge on internal power distribution as no BNO has ever been appointed.

That would be work outside of your flat. Can you post your EICR with any identification redacted for us to comment on?
It could also be SP Energy Networks
 

Reply to Rewiring entire block? in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
279
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
776
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
787

Similar threads

Yes the first bit is just standard wiring, TNS lead cable into cut-out, cut-out to meter, meter to DP isolator, top of isolator is sealed as per...
Replies
8
Views
1K
The challenge that you have with this is that you've no confirmed start point. Because you have a lack of an EICR you don't actually know what...
Replies
7
Views
579

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top