Looking for some advice and timescale here. I'm not an electrician just a tennet with a housing association. I've been offered top floor flat in a tenement building( build 1930's) but I can't get moved in until Scottish Power have carried out works described as "Rewiring the entire block".
Does this mean full Street? Or simply the tenement ?. This sounds like major work to me which is likely to take months to complete?
The flat I've been offered is the only one that has failed EICR tests, this is after an isolator was installed.
Does this mean full Street? Or simply the tenement ?. This sounds like major work to me which is likely to take months to complete?
The flat I've been offered is the only one that has failed EICR tests, this is after an isolator was installed.