I have been trying to replace a CU on a domestic property.
During my initial checks, there was no isolator and the earth was only 6mm on a TN-C-S. There is a label stuck to the cut out stating that it was PME. The cut out is a long brown Bakelite style with no access to the PME earth point.
I spoke to the DNO (UK Power Networks) and they advised me to speak to the meter operator (British Gas) about the isolator. I then asked them about upgrading the 6mm earth and they initially said they would book it as a call for them to come out pull the cut out and upgrade the earth.
I speak to the MOP (British Gas) and they tell me that it is against the law for me to pull the cut out and that the customer needs to book an isolator to be installed at a cost of ÂŁ31.42. The customer duly books and pays for the isolator. I also tell them about the upgrade to the earth at which point they tell me to talk to the DNO (UK Power Networks) and proceed to give me the number that I already have.
That is when I received the call back from the DNO who said that they would not come out and upgrade the earth as the MOP would do this when they fit the isolator. I explain that the MOP have told me to contact the DNO to organise but they said that the MOP would do this without any problem.
I've been on site now for 2 hours talking to various companies with the customer in the middle having to talk to that same people about something they know nothing about, stopping every now and again to speak to me to make sure they relay the information correctly.
So the MOP is booked for Monday (today), I'm not available, he duly arrived and fitted the isolator but would not upgrade the earth, said he was not allowed to and would not do it.
He then told the customer that the electrician can pull the cut out and upgrade the earth ?????????????
This is a ridiculous and frustrating situation. If the MOP had allowed me to pull the cut out I could have carried out the isolator install and upgraded the earth and informed them that the work was happening. They could have saved their engineer (I use this term loosely) a visit and an isolator which must have cost them way more than the ÂŁ31.42 they charged. Then they could just re-seal the cut out on their next meter reading visit.
I am now in a situation where, when I go back to site, I will have to contact the DNO and inform them that the MOP did not upgrade the earth, they will then ask me to phone the MOP and I will be in a continuous circle of finger pointing.
Very frustrated rrr:
During my initial checks, there was no isolator and the earth was only 6mm on a TN-C-S. There is a label stuck to the cut out stating that it was PME. The cut out is a long brown Bakelite style with no access to the PME earth point.
I spoke to the DNO (UK Power Networks) and they advised me to speak to the meter operator (British Gas) about the isolator. I then asked them about upgrading the 6mm earth and they initially said they would book it as a call for them to come out pull the cut out and upgrade the earth.
I speak to the MOP (British Gas) and they tell me that it is against the law for me to pull the cut out and that the customer needs to book an isolator to be installed at a cost of ÂŁ31.42. The customer duly books and pays for the isolator. I also tell them about the upgrade to the earth at which point they tell me to talk to the DNO (UK Power Networks) and proceed to give me the number that I already have.
That is when I received the call back from the DNO who said that they would not come out and upgrade the earth as the MOP would do this when they fit the isolator. I explain that the MOP have told me to contact the DNO to organise but they said that the MOP would do this without any problem.
I've been on site now for 2 hours talking to various companies with the customer in the middle having to talk to that same people about something they know nothing about, stopping every now and again to speak to me to make sure they relay the information correctly.
So the MOP is booked for Monday (today), I'm not available, he duly arrived and fitted the isolator but would not upgrade the earth, said he was not allowed to and would not do it.
He then told the customer that the electrician can pull the cut out and upgrade the earth ?????????????
This is a ridiculous and frustrating situation. If the MOP had allowed me to pull the cut out I could have carried out the isolator install and upgraded the earth and informed them that the work was happening. They could have saved their engineer (I use this term loosely) a visit and an isolator which must have cost them way more than the ÂŁ31.42 they charged. Then they could just re-seal the cut out on their next meter reading visit.
I am now in a situation where, when I go back to site, I will have to contact the DNO and inform them that the MOP did not upgrade the earth, they will then ask me to phone the MOP and I will be in a continuous circle of finger pointing.
Very frustrated rrr: