Doing a job where the upstairs lighting feeds and shower cable are currrently being routed through the back of a cuboard where the boiler is kept. Boiler housed in a cuboard in the bathroom upstairs.
They cables are not that close to the boiler itself and the obvious concern to me would be the temperature, but we are talking a boiler and not immersion heater.
To re-route the cables would be a mission (i.e. channelling) so I would be interested to see if anyone has had a problem with keeping the cables routed this way (now the 17th is here) on any inspection from their scheme?