Hi, I am burying wire from the outside meter panel to the new 100amp sub panel inside a garage. The run is 20' long. Is 2-2-2 Aluminum URD Cable good enough or do I need the 4/0-4/0-2/0 Black Stranded Aluminum Triplex URD Cable? Anyone that can answer I would greatly appreciate it.