Current project is a single story extension for a client involving DNO moving supply, relocating and new CU, first fix, second fix.
Client also wants to run some SWA to the garage. The most logical route, as they are already dug, is to lay the cable in the (very deep) footings of the extension once the first few courses of block are in place.
If the builder agrees, I'll bring the SWA out at the exisiting corner of the house, after a short run through the cavity, into the new cavity for a few inches then exit into the footings to run alongside the blockwork at depth.
I'll obviously use some soft sand top and bottom of SWA and warning tape etc.. my only niggle is running the cable in the footings alongside the blockwork. I'm pretty happy theres nothing in 17th stopping me, however does anyone know of any building code or similar that would be an issue..? (for the record the SWA would be about 5' undergound running parallel to brick alongside new extension until crossing a smal path to garage).
Client also wants to run some SWA to the garage. The most logical route, as they are already dug, is to lay the cable in the (very deep) footings of the extension once the first few courses of block are in place.
If the builder agrees, I'll bring the SWA out at the exisiting corner of the house, after a short run through the cavity, into the new cavity for a few inches then exit into the footings to run alongside the blockwork at depth.
I'll obviously use some soft sand top and bottom of SWA and warning tape etc.. my only niggle is running the cable in the footings alongside the blockwork. I'm pretty happy theres nothing in 17th stopping me, however does anyone know of any building code or similar that would be an issue..? (for the record the SWA would be about 5' undergound running parallel to brick alongside new extension until crossing a smal path to garage).