Mark.W
-
Morning gents
I've got my 2391 practical today, and stressing a bit when it comes to safe isolation.
I know we need to do a PIR. Is it acceptable to isolate the board at the 3ph isolator, test to ensure system is dead, lock off, place warning signs on DB, and carry on with testing? Or do we have to isolate each circuit as we go along?
Any useful tips about the practical would come in handy?
What about performing a zs on a lighting circuit? If EAWR do not permit live testing how do we do it?
Oh my head hurts!!
I've got my 2391 practical today, and stressing a bit when it comes to safe isolation.
I know we need to do a PIR. Is it acceptable to isolate the board at the 3ph isolator, test to ensure system is dead, lock off, place warning signs on DB, and carry on with testing? Or do we have to isolate each circuit as we go along?
Any useful tips about the practical would come in handy?
What about performing a zs on a lighting circuit? If EAWR do not permit live testing how do we do it?
Oh my head hurts!!