Called out as lost sockets and lighs.
Boiler broken.
One open plan office with 11 2Kw fan heaters on six 32A RFCs in a DB fed from a TP 63A switch fuse.
They had 7 heaters on one phase, plus the base load.
And.....
Four windows wide open....
And...
Air-con unit cooling.
Office full of lasses and none share the same requirements for heat/cold and utterly unwilling to compromise.
My suggestion of jumpers did not go down well.
Anyhow, replaced the fuse and told them no more than four heaters.
How long til I'm back?
Boiler broken.
One open plan office with 11 2Kw fan heaters on six 32A RFCs in a DB fed from a TP 63A switch fuse.
They had 7 heaters on one phase, plus the base load.
And.....
Four windows wide open....
And...
Air-con unit cooling.
Office full of lasses and none share the same requirements for heat/cold and utterly unwilling to compromise.
My suggestion of jumpers did not go down well.
Anyhow, replaced the fuse and told them no more than four heaters.
How long til I'm back?