How come the sequence of tests in guidance note 3 is that the Zs test comes before the PFC test?

Isn't it normal to do PFC test before the Zs test? Because then you can do your PFC test, put the board cover on and energize the board without coming back to do the PFC test.
 
Do you mean Ze, the impedance at the board, before you do the Zs, impedance at end of circuit?

In practically all cases you measure Zs/Ze along with the related PFC using your MFT.
 
How come the sequence of tests in guidance note 3 is that the Zs test comes before the PFC test?

Isn't it normal to do PFC test before the Zs test? Because then you can do your PFC test, put the board cover on and energize the board without coming back to do the PFC test.

Can you post a picture of the list of tests you are referring to, there may be a detail you have missed.

Which Zs test is it referring to? The Zs at the DB or the Zs of final circuits?

PFC is calculated and displayed by the test meter for every loop impedance test, it's not possible to carry them out as seperate tests.
 
PFC is calculated and displayed by the test meter for every loop impedance test, it's not possible to carry them out as seperate tests.

not on all meters. on the megger 1552/3 they are separate tests. don't know about the 1700 series.I can't afford anything that fancy.
 
not on all meters. on the megger 1552/3 they are separate tests. don't know about the 1700 series.I can't afford anything that fancy.

Really? That seems a bit backwards considering that the meter doesn't measure the PFC, it measures the loop impedance and voltage and calculates PFC from that.

I've got a 1700 series and that displays PFC on the same screen, on my seperate high resoloution loop tester you press a button to cycle the display to show PFC.
I think the fluke and Kewtech I used in years gone by were the same, press a button to cycle the display and show PFC.

I just assumed they were all the same.
 

if you zoom the pic, it shows separate tests for pfc. both on hi current and no-trip.

also posted link as this looks matbe a good buy for any trainee on a limited budget.
 
As an eBay Associate we earn from qualifying purchases.
if you zoom the pic, it shows separate tests for pfc. both on hi current and no-trip.
A bit odd as the measurement (as already pointed out) basically reveals Zs from observing delta-V while switching a known delta-I, and then from the voltage, computes PFC = V / Zs

Maybe to have an extra "feature" to sell?

Maybe the display lacked the space to show both simultaneously?
 
Can you post a picture of the list of tests you are referring to, there may be a detail you have missed.

Which Zs test is it referring to? The Zs at the DB or the Zs of final circuits?

PFC is calculated and displayed by the test meter for every loop impedance test, it's not possible to carry them out as seperate tests.
I meant Zs of final circuits. Not the Zs at DB for which you need the board to be open.
After insulation resistance I'd do supply polarity, Zs at DB, then PFC, then put the lid back on, energise the board, then do the Zs of final circuits.
[automerge]1596713360[/automerge]
if you followed the correct Sequence of tests you just do You Earth Fault Loop Impedance Ze at the board and add your result to your R1+R2 then do your PFC tests.
One person says Ze another Zs at DB can we please come to a common denominator? If it's a DB test, then it's a Zs at DB. And that's not even my question.
[automerge]1596714800[/automerge]
Do you mean Ze, the impedance at the board, before you do the Zs, impedance at end of circuit?

In practically all cases you measure Zs/Ze along with the related PFC using your MFT.
I'm not talking about Ze/Zs at DB at all. It's a test done on a dead board right? So is PFC test i.e. I don't need to energize the board. Only for the Zs of final circuits I need to energize the board. So I thought would it make sense to change the sequence, do the PFC at DB then the Zs of final circuits.
 
Last edited:
For what it’s worth once I measure Ze , I reconnect the earthing conductor and immediately perform a pefc With all parallel paths in place and then a pscc test and record the higher value as the PFC at the origin of the installation.
To me it’s an obvious thing to do while you are physically already at the CU position.
The sequence of tests in gn3 has protection by automatic disconnection of supply to be verified before earth fault loop impedance of the external earth supply and pfc testing anyway.
 
Last edited:
I'm not talking about Ze/Zs at DB at all. It's a test done on a dead board right? So is PFC test i.e. I don't need to energize the board. Only for the Zs of final circuits I need to energize the board. So I thought would it make sense to change the sequence, do the PFC at DB then the Zs of final circuits.
If it is a dead board then you can't measure the supply PFC - that (i.e. Ze) is a property of the supply itself.

You might chose to assume values such as 0.35 / 0.8 ohm for TN-C-S / TN-S and then estimate you Zs by adding R1+R2, but usually the whole point of determining the supply PFC is to verify that the switchgear/MCBs/etc are able to safely interrupt a fault.

The Zs / end of circuit PFC is important as well, it will almost certainly be lower than the DB PFC, but it will allow you to verify that your circuit's OCPD can disconnect fast enough.

To be fair. in most domestic cases you will never see a scary PFC that presents problems, but if you are inspecting and find a board with rewirable fuses you really ought to verify they can break the supply that is actually present. They might not!
 
I meant Zs of final circuits. Not the Zs at DB for which you need the board to be open.
After insulation resistance I'd do supply polarity, Zs at DB, then PFC, then put the lid back on, energise the board, then do the Zs of final circuits.
[automerge]1596713360[/automerge]

One person says Ze another Zs at DB can we please come to a common denominator? If it's a DB test, then it's a Zs at DB. And that's not even my question.
[automerge]1596714800[/automerge]

I'm not talking about Ze/Zs at DB at all. It's a test done on a dead board right? So is PFC test i.e. I don't need to energize the board. Only for the Zs of final circuits I need to energize the board. So I thought would it make sense to change the sequence, do the PFC at DB then the Zs of final circuits.

In which case yes you would normally carry out the Zs at the DB, PEFC and PSCC tests before closing the main switch of that DB on initial verification.

You are correct that Ze and Zs are different things, sadly on the forum you will often see them used interchangeably.

Zs and PFC are live tests carried out on a live supply, they are not dead tests.
The main switch of the DB does not need to be closed, but the supply up to the main switch does need to be energised.
 

Reply to Sequence of tests in guidance note 3 (initial verification) in the UK Electrical Forum area at ElectriciansForums.net

Similar threads

  • Question
My older card has it but my newer card doesn’t
    • Like
Replies
1
Views
574
  • Question
That looks like a Metrel display (I have one), they have a permanent 3 wire display that measures the three combinations so I would say that’s a...
Replies
5
Views
689

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top