hi fellas, newbie here, ive just run a supply to my metal shed, i live in a park home so all sheds have to be metal, i came off of the outside meter box/cabinet, which houses an rcd-mainswitch, and a 40a mcb for the p/home, i fitted a 16a breaker within the cabinet as there was a din rail with a bit of space left
i came off in hip conduit(buried the horizontal run) and used 2.5 mm twe, to the shed (which is 3 mtrs away)--
into a skt&a spur for the light, i used an earth rod for grounding,at the shed end, not the twe-cpc the same as the main installation has. ive been out of the game for a few yrs now , is that the way you guys would have done it?- did i need to install the rod? could i have used the twe-cpc ?
thanks for looking, andy
i came off in hip conduit(buried the horizontal run) and used 2.5 mm twe, to the shed (which is 3 mtrs away)--
into a skt&a spur for the light, i used an earth rod for grounding,at the shed end, not the twe-cpc the same as the main installation has. ive been out of the game for a few yrs now , is that the way you guys would have done it?- did i need to install the rod? could i have used the twe-cpc ?