G
gunner
guys would appreciate a some advice.at work in the coffee bar there is an existing single phase coffee machine.it is fed locally from a small cu.a three phase supply has been run in next to the single from the main cu on the floor and a trial coffe machine has been installed.i have labelled the 415 as a precaution .is this good practice to have two machines on different supplies.cant find anything in the 17th