SJIB approved ACA test. | on ElectriciansForums

Discuss SJIB approved ACA test. in the Certification NICEIC, NAPIT, Stroma, BECSA Forum area at ElectriciansForums.net

Joined
Oct 5, 2010
Messages
7
Reaction score
2
Location
Aberdeen
Hi All.

This is my first post, seems like a usefull source of info!

I have my ACA test in cambuslang coming up soon, I was hoping to get a little bit more information on what it consists of. Most google searches bring me back to this site, where a few scottish bods have been asking the question but the threads arent really answered.

Anyway, anyone in here sat the SJIB test and fancy telling my what to revise/prepare for?


Cheers folks!

_chris
 
Chris,

The ACA consists of 6 parts,
A. Risk assessment and Safe Working Practices- (HSG85will help you out here)
B. Safe isolation of supplies- (see the back of your old,log book if you have it or see hsg85 for this also)
C. Inspection and testing- ( the onsite guide and guidence note 3 give good guidance on this)
D. Fault finding- ( the 4 faults short/earth/open/reverse- on an installation that are introduced one at a time)
E. Supervision- (assesed in your knowledge and ability to supervise operatives)
F. Underpinning Knowledge- (covering H&S, BS7671, SWP, Inspection and Testing, the Electricity Supply Regulations, Building Standards)

Hope this helps

G.
 
This is for any1 looking for more information on the aca test. Ive just failed mine ! If i had a wee bit more heads up, then i would have passed, as they try to trip you up ! 1st off, safe isolation, oiss easy.....but ALWAYS put the key for the lock in your pocket......i didnt, simply cos the table was blocking the booth i was in, with the examiner on the other side.....but thats how i failed, stupid, as sum1 wud hav had to pick up the key, walk into the booth with me there, take the padlock off in front of me and switch on the power.....so am a bit ragin with that nonsense ! Inspection and testing....something else the examiner failed to point out. when it came to do the external earth loop...he wouldnt let me put the power on, i was bemused and couldnt work out what else to do, as they supply you with everything....so i couldnt complete the tests, so at the end the examiner points out the insulations sheets and clamps, under the desk that had all the testing machines on.....yeh, out the way where you wouldnt notice them, so basically they want you to cover any trunking and that with looks to be buiders bags....the scenarios all contridict themselves as the trunking is attatched to the earthed main board which is supply the smaller main board that your testing, oh, but you've to "pretend" that the board your testing and its supply comes from outside.......another money makin scheme and a way to trip u up unless someone is able to help you ! hope this is of help to any1, ill b goin back to pass as i no thier tricks now, just this time its bleedin costin me !!!
 
Hello. Many thanks for your post hopefully this info will help me with my aca test coming up next month. Hope you dont mind me asking a couple of questions. Just wondering what the "risk assessment" part involves. Do they give you a sheet to fill out ? Also what does the "supervision" part consist of ? Seems they are trying to trip you up at every available opportunity. Any help would be much appreciated. Cheers...
 
Got ma resit in 2 weeks. with the risk assessment, they just give you a wee sheet stating - change light fitting - then they add the scenario, like, the light fitting in the factory or something. the sheet has 3 coloums, 1st - hazard - fill out the basics, height, sufficient light etc, next coloum is what you do to prevent the hazards, scafolding etc, 3rd coloum is who the risk affect...roughly that set up, just be over the top with it, use scafolding,saftey hats, cordon off area, do work at weekend so no public is in, make sure safe isolation is followed and all that. again, plenty room for error cos they give you f-all space to put any detail in.
As for the supervision, ---- easy, its 4 job scenario's with 10 statements each, all you do is circle whether you agree or disagree with the statement, common sense mostly, as in, 3rd year apprentice needs experience in testing, 1 - you let him test the whole installation himself - yes/no, no, simply cos if it were me, id be showing him through it and remember testing involves live tests.

multiple chocie question paper at the end is pretty solid to start with so make sure you read through all the books listed in the aca leaflet.
 
Cheers man, Much appreciated. Am I correct in saying that the question paper at the end is open book ? Do they provide the relevant books etc ?

All the best with your resit mate. Cheers
 
Aye the books are there and they tell you what section goes with what book. 1st 10 questions are solid from the on site guide and bs7671, then after that, its just a case of findin what the statement is correct,so you just find it in the appropriate book, biggest problem is time, i didnt waste any time and still only had 5mins spare. so if your strugglin with 1, move on and go back to it at the end, then if you cant get it, take a guess haha.
 
aye, passed it on fri mate ! well "unofficially" until i get the letter haha, gr8 feelin though. few pointers for ye.

Risk assessment, mention that all PPE is worn, Mention safe isolation(a must),brief other electricians or labourers on job in hand,cordon off area,use scaffolding if at height etc, just totally over do it. But, if its says theres no isolation possible, you just write that the job needs to be arranged another time ! No live working ever ! or they will fail you. Same if it says its a house and theres a child and mother in, say it needs to be arranged that the mother and child are out when the work gets carried out.

Safe isolation - check test lamps or socket tester on known source, check circuit you've to isolate is already live, turn breaker off, lock and KEEP KEY IN POCKET til he asks you to put it back to its orginal state, retest lamps or socket tester again on known source to prove workin correctly. mind and fit warning notices. On 3 phase board, 10 tests to check if dead, L1,L2,L3 between each other, the all to E and N, then between E & N.

Fault finding, open main board where cicuit has a fault and just bell between the socket or switch and the main board on the E,N & L, then you'll find if theres open circuit, polarity, or test between and conductors to see if theres a short. With the motors, think it was a neutral fault.

Testing - lamps, starters, rcd sockets, rcds,neons need to be disconnected, Big main board has an led display, that needs to be isolated, theres wee fuses u flick out for that. Main neutral on 3 phase board may need to be disconected due to it bein a tncs system so wud affect your results.

Live testing - need to put up plastic sheetin to protect yourself from them trunkin in case of a fault. Ze earth fault results, he'll ask you whether its acceptable and ask you where in the on site guide you can find out whether it is or not. Lighting/power boards Ze is too high by the way.
Rcd socket test - test on both o degrees and 180 degrees, write down the results, 15mA ,30mA, 150mA.

Then you'll test another booth, which he will add in faults, ring main not in a ring on 2 of the conductors, polarity fault. The screw in lamp holder has reverse polarity, live should b the centre contact, but instead its the outer screw.

Oh aye, mention that 2 way lighting needs to be tested as well, try and mention as much as you can, cos they wont ask you to test everythin so if you point enough out and answer their questions you'll b grand cos they are actually marking you on you answers too and mark you down when you fail to point things out.

Also know what your rcd sockets should trip within, 200ms at 100%, 40ms at 500%. but rcd main switch 300m/s.
make sure you right down the tests in the right order, L TO N 1st, L to E then E to N last.

Test for supervisin, multiple choice, common sense, again, no apprentice can do live working or testing and never left to things on their own, should be fully instructed etc. so mind that when agreein or disagreein with the statements.

Last test, 1st 10 questions pretty solid, dont waste time, go back at the end if strugglin, then after that, its just a case of matchin the right statement to the correct statement in the books, watch cos some are worded similar.

Simple eh hahaha !
 
Well done mate, congrats. Thanks again for all that info. Very much appreciate you taking the time to write back. Its great to be given a heads up on what is coming my way.

Do they give you connector strip or something to terminate cables from rcd socket and to bypass rcd's etc ?

I take it you are speaking about the 'maximum earth fault loop impedance table' in the osg ?

Oh aye sounds siiiiiimples (meerkat) lol :D

Cheers Bud
 
aye, everythings supplied, just take yer time and think everythin through, but dont over think it if ye get me. Let me know how ye get on and feel free to ask anythin else.
 
Also could you ex[lain what you mean when you are talking about the rcd test in the right order L - N, L- E, N - E. Do you not just use the plug attachment for the test set ?
 
I didnt actually have to disconnect the main neutral, but one of the lads tha did it had too, theres 3 booths so i think it must have been the one with the motors. As long as you mention it when he asks what should be done before testing can start, then he'll he either say yes or no cos the power comes from a main RCD switch.
As for the Rcd test, aye its just the plug you use. need to manually go through the tests on the meter to prove you know what your doin. As for the L-N etc that i wrote about, that was me just remindin you that when you do your earlier test to record it down in the right order, nothin to do with the Rcd test haha, think i was just in full flow typin and tryin to get down everything that came to ma head. Basically, the 1st bot i did i wrote down L - E, L-N, N-E by accident and lost a point for that.
 

Reply to SJIB approved ACA test. in the Certification NICEIC, NAPIT, Stroma, BECSA Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
279
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
776
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
787

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top