got talked through it by gut whon ran a PV company
pannels mounted on ali frames
pos and neg through a DC invertor to an AC isolator
cable down to board, through another AC isolator and meter
into board and into 16A breaker
thats it

My understanding was that the cables from the modules need to go to a DC Isolator, before they're fed into the inverter. Is that wrong then? I need to get this right as I'm doing my first install in the next few days! Thanks in advance.
 
My understanding was that the cables from the modules need to go to a DC Isolator, before they're fed into the inverter. Is that wrong then? I need to get this right as I'm doing my first install in the next few days! Thanks in advance.


Yes that is what Lloyd1980 put

"pos and neg through a DC invertor to an AC isolator"
 
Yes that is what Lloyd1980 put

"pos and neg through a DC invertor to an AC isolator"

OK, apologies for me misunderstanding then but I thought a DC isolator is needed, which is then connected to an inverter. Is the inverter the isolator too then? Steep learning curve this isn't it? Haha.
 
No it should be me apologising. I read it as DC isolator where he wrote DC Invertor :eek:

So from the Array to the DC Isolator and then into you Invertor. Out of the invertor into a AC isolator. Then your AC supply back to the FIT meter.

If the invertor is in the loft, as most are, then from the FIT meter into another AC isolator and then your RCD.
 
No it should be me apologising. I read it as DC isolator where he wrote DC Invertor :eek:

So from the Array to the DC Isolator and then into you Invertor. Out of the invertor into a AC isolator. Then your AC supply back to the FIT meter.

If the invertor is in the loft, as most are, then from the FIT meter into another AC isolator and then your RCD.

Malcolm, you're a gentleman. Thanks for your help there mate.:)
 

Reply to solar pv - no spare way in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
395
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
983
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

This was posted this week, on topic ....... https://niceic.com/newsletter/omission-of-overload-protection/?dm_i=7G1W,7GCE,K4L2A,WHET,1
Replies
8
Views
722
Yes the first bit is just standard wiring, TNS lead cable into cut-out, cut-out to meter, meter to DP isolator, top of isolator is sealed as per...
Replies
8
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top