customer called me up today as they have been let down, anyone fancy doing tomorrow, im happy to pay the money directly into your account if that helps!
As discussed we would require an electrician to attend at:
Southwark Primary School
383 Southwark Park Road
London
SE16 2JH
Preferably it would be tomorrow morning (22nd December AM) to connect a 32Amp single phase commando socket onto an existing supply and perform a dead test while my engineers were on site.
I realise it is short notice, however we have been let down and are struggling.
As discussed we would require an electrician to attend at:
Southwark Primary School
383 Southwark Park Road
London
SE16 2JH
Preferably it would be tomorrow morning (22nd December AM) to connect a 32Amp single phase commando socket onto an existing supply and perform a dead test while my engineers were on site.
I realise it is short notice, however we have been let down and are struggling.