Do you know if split metering for separate power and lighting can be supplied for small 4 or 6 way consumer units. I am looking at a job that has a large number rooms and the client wants split metering for the power and lighting. I had proposed installing a small CU in each room.

A large dis board on each floor with separate meters for power and lighting could be fitted and then each room is fed with its own power and lighting circuits, however this would mean very long runs for the final circuits, hence my proposal for installing CU in each room.

Any help would be appreciated, thanks.
 
Brightspark- Can you get meters that are built into or can be fitted IN the consumer units. There will be one lighting and possibly 2 power circuits per room, and I have proposed a consumer unit for each room (As you often see in hotles, care homes etc) as a distribution board installed at one end of the corridor would entail excessive runs for the power and lighting circuits. The client wants the power and lighting to be separately metered. I know that split meter boards are available for 24way single phase boards from Schneider (12 for lighting, 12 for power) but I need a 4 or 6 way board max and wasnt sure if you could get integral meters for these????
 
You can get them pre installed but ive only seen them on larger consumer units and dist boards...but thats not to say there not available...

Your other option is get din rail mounted meters and make your own consumer unit up either with a empty consumer unit or an enclosure. I know Hager do quite a big range of enclosures with din rail in that come in all different shapes and sizes...the din rail mounted meters are about 3-4 modules wide...so about 3-4 MCBs...

If you wanted different circuits metered within the cosumer unit then get a 2 or 3 tier enclosure with MCBs on one level and meters on the next tier...

The possibilities are endless my friend...
 
Cheers, thats an option, will need to look into the variations of cost of making up CU up as I can only find the pre installed ones on larger dist boards like you say. It may be just as worthwhile having long runs for the final circuits from a large dist board located at the end of the corridor.
 

Reply to Split board metering in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
295
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
802
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
838

Similar threads

  • Question
IMO Better to do something about those ignoring regulations first! Current system is like having a speed limit but not enforcing anyone without a...
2
Replies
20
Views
2K
  • Question
if the 3 spaces with charge points are always allocated to the same 3 flats, surely the easiest way is to run the supply to the load side of the...
Replies
9
Views
898

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top