Hello everyone, planning an install were it is impossible to get back to the cu.
Currently have a outdoor socket (on a ring with rcd protection) which i am planning on spurring of and putting a 13fused spur next to it. From here (loadside) a 2.5mm armoured has already been installed for approx meters underground to get to the garage. In the garage will be 1 x double socket and then a fused down 3amp spur to supply the lighting circuit. For reassurance... would anyone do anything differently? Isit worth putting a rcd spur before the armoured out to the garage? A neighbouring garage suffered from a slight roof leak (now resolved)...just incase im being overly cautious as anyone should be.
Currently have a outdoor socket (on a ring with rcd protection) which i am planning on spurring of and putting a 13fused spur next to it. From here (loadside) a 2.5mm armoured has already been installed for approx meters underground to get to the garage. In the garage will be 1 x double socket and then a fused down 3amp spur to supply the lighting circuit. For reassurance... would anyone do anything differently? Isit worth putting a rcd spur before the armoured out to the garage? A neighbouring garage suffered from a slight roof leak (now resolved)...just incase im being overly cautious as anyone should be.