Hi I have been asked to price a big job and I’m not sure if I’m pricing it right any advice would be greatly appreciated. It’s one big house being split into 2 big flats the ground floor is going to be 3 bedroom 2 bathrooms kitchen lounge and a office in Total there is 98 points. Then upstairs is having a loft extension it will be a 4 bedroom 2 bathroom lounge kitchen and office it as 98 points in total I was looking at £50 per point so £9800 dose this sound about right or am I selling myself short.