Hello there
have a problem re internal walls. there made of compressed straw between plasterboard, which i think makes them stramit board. i have been told that there are preformed channels for cable/pipe, does anyone know the spacing of these channels?? or where to find out?
one more thing as this is basically a compressed straw wall will cable derating be the same for a fully insulated wall?
many thanks